Each year DPW implements its paving program, which runs from April thru November. There are two types of paving that take place throughout the City.

Pavement Condition August 2017

Slurry

When streets are resurfaced it is a two-step process.

    1.   Surface preparation to seal cracks and keep out water

  • Patching potholes, leveling uneven areas, applying an asphalt underlayment
  • During this process the road may be rough and unsightly for several weeks

    2.   Slurry application

  • About 3-4 weeks following the preparation work
  • Emulsified asphalt is spread over the pavement to extend the life of the pavement and provide a smooth surface

Street Paving 2
Street Paving 5

Milling and Overlay

If the asphalt has reached the end of its life cycle, milling 1” to 2” of existing asphalt and placing a new surface is an option to extend the life of the pavement versus a total remove and replace.


Street Paving 4
Street Paving 3

Contact Information:

Dept of Public Works
City of Richmond
900 E. Broad St., Suite 704
Richmond, VA
23219 USA
Map It
Hours: Monday -Friday
8 a.m. - 5 p.m.
Customer Care Center: 3-1-1
or (804)646-7000

311

Logo for 311

If you have any questions, please call the City’s Customer Care Center at 3-1-1 or (804) 646-7000

RVA Impact Map displays projects (i.e. gas, water, paving, etc.), events (i.e. parades, races, block parties, etc.) and right of way impacts (i.e. detours, partial and full lane closures, barricades, parking restrictions, etc.) as an interactive map for informational and navigational purposes. Data displayed is refreshed as changes are made.

Visit our Twitter Page        
   


This is a print version of the webpage. The navigation of the site has been removed through the print css. If you require a printout of the page as it looks in your browser, please use screen capture.